Who needs SMC

CMMC Level 1 Today.
Level 2 Is Coming.

Many shops handling Federal Contract Information will be reclassified to Level 2 as primes flow down CUI requirements. SMC gets you ready now.

Federal contractors and subcontractors currently at CMMC Level 1 — typically smaller machine shops with minimal IT infrastructure that handle Federal Contract Information (FCI) but are beginning to receive CUI designations from their prime contractors.

The Problem

What You're Facing

Level 1 is self-assessed today — but the bar is rising

Prime contractors are beginning to flow down CUI designations to lower-tier suppliers

No visibility into what files are on which machines

Minimal IT infrastructure — often one person covering the whole shop

What We Hear

"Our prime just told us we need to handle CUI starting next year."

"We passed Level 1 self-assessment but we're not ready for Level 2."

"We don't even know what's on our CNC machines right now."

SMC's Answer

Get ahead of the requirement

Install SMC at Level 1 and be ready when the Level 2 mandate arrives. The system is the same — no upgrade, no reinstall, no disruption.

Know what's on your floor

See exactly what programs are on which machines, who put them there, and when. Visibility you don't have today.

No disruption to production

Operators learn it in minutes. Nothing changes on the floor. The compliance story improves invisibly.

One day to install

RS-232, Ethernet, and native protocols across 12 controller families. No controller modifications. No production downtime.

Ready to Get Ahead of Level 2?

See how SMC works and what it looks like on your floor.

See How It Works → Request a Demo